Home
/Gallery/Installation of Two Linked Nets For Solar Panel Protection

Installation of Two Linked Nets For Solar Panel Protection

Last updated at 

Direct-Attach-Linked-Nets.jpeg

This customer had an irregular shaped array layout, requiring a triangle and a rectangle to be linked using carabiner spring clips.

The supports are Direct Attach corner and side brackets.

Installation time was about 3 hours by an inexperienced handyman installar with one helper.

Solo_Beat

Talk to an Expert

Quick Links

How it works

Resources

Contact

Terms & conditions - Privacy Policy

Copyright 2024, SunnyCal Solar Inc. | All Rights Reserved Designed & Developed by Team Underscore Technology